Notes:
4 STORY OFFICE BUILDING/ STONEBRIAR CENTER PH I
5/28/1997 12:00:00 AM
SUBS:BRANDT ENGINEERING PLBG&MECH WALKER ENG ELECTRIC
(6/6/97 - JAMES) 140 FT.NORTH GRADE BEAM.30FT.EAST WALL.C.E8,F8,G8
(6/12/97 - SCOTT) SLAB TO GRADE D&E,1 TO 8, F&G,1 TO 7, COL.K7,K5&J7
(6/16/97 - SCOTT) BEAM D.6 TO F.4
(6/18/97 - JAMES) COL. E9,F9 300 YDS. OF PAVING. PARKING
(6/24/97 - JAMES) DECK LINE 1 TO LINE 8.A TO E.5. WALL F3 TO F4 TO .COL. F.4 TO F.7. PARKING SEC. 1 AND SEC.5.
(6/25/97 - CHARLES) 300 YDS. FIRE LANE. 12 COL. FROM 1 TO 2
(6/26/97 - JAMES) 6 COL 1 TO 2.
(6/27/97 - JAMES) PARKING LOT.
(7/1/97 - JAMES) DECK POUR.
(7/2/97 - CHARLES) COL.F1 TO F8 4 TOTAL
(7/3/97 - JAMES) 4 COL. G. LINE 1 TO 8 LINE
(7/9/97 - JAMES) SECOND FLOOR DECK WEST SIDE
(7/10/97 - JAMES) COL. B2,B7,C1,C3,C6,C8,D1,D3,D6&D8
(7/14/97 - JAMES) EAST DECK 2ND. FLOOR
(7/15/97 - JAMES) COL. F1,F3,F6,F8 COL. THIRD FLOOR D L9INE G LINE
(7/16/97 - JAMES) COL. J1,J7,J8
(7/17/97 - JAMES) 4 COL. K2,K4,K5,K7
(7/18/97 - JAMES) WEST SIDE OF THIRD FLOOR DECK
(7/21/97 - JAMES) 3RD. FLOOR COL. A2,A4,A5,A7,B1,B2,B7,B8
(7/23/97 - JAMES) 10 COL. ON THRID FLOOR.
(7/25/97 - JAMES) EAST SIDE OF THRID FLOOR DECK.
(7/29/97 - JAMES) EAST SIDE OF FORTH FLOOR DECK
(7/31/97 - JAMES) 12 COL. 4TH. FLOOR B,1,2,7,8 C,1,3,6,8 D,1,3,6,8
(8/1/97 - JAMES) 4TH, COL. A,2,3,4,7 E,1,3,6,8
(8/4/97 - DAVID) 4 COL. 4TH. FLOOR F,1,3,6,8
(8/5/97 - JAMES) 4TH. FLOOR COL. G,1,3,6,8 H,1,3,6,8
(8/6/97 - JAMES) COLS ON 4TH. FLOOR J,1,2,7,8 K,2,5,7
(8/14/97 - JAMES) EAST SIDE OF ROOF DECK
(12/12/97 - JEFF) FIRE WALL CAULKING ALL FLOORS THRUST BLOCKS E.F.D. CONN. D.M