Notes:
1- CONTINGENT UPON COMPLIANCE WITH BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- COORDINATE ALL CONSTRUCTION WITH THE MEDICAL PHYSICIST'S REQUIREMENTS FOR ALL ROOMS OR AREAS NEEDING PROTECTIVE SHIELDING AS REQ'D.
3- RADIOLOGICAL PHYSICIST MUST ADVISE IN WRITING ON WHEREABOUT ADDITIONAL RADIATION PROTECTION IS NECESSARY FOR THE MRI ROOM TO BE INCORPORATED INTO CONSTRUCTION OTHER THAN THE MANUF. RECOMMENDED RADIO-FREQUENCY SHIELDING SYSTEM.
4- STRUCT'L SUPPORT FOR MRI EQUIPMENT MUST INCLUDE ADDED NEW CONC. BMS PLACED UNDER THE EQUIPMENT'S BEARING POINTS AS REQ'D, REGARDLESS OF SLAB THICKNESS OF EXIST'G RATED FLOOR.
5- TRENCHING OF RATED FLOOR IS NOT ALLOWED. FLOOR ELECTRICAL/COMMUNICATION BOXES, IF ANY, SHALL BE ONLY BY FIRE RATED POKE-THRU TYPE DEVICE OF APPROVED DTLS. PENETRATIONS BY ELECT'L CONDUITS, PIPES, ETC, MUST BE BY CORE DRILLING AND FIRE-SEALED AS PER UL-LISTED DESIGNS MATCHING THE RATING OF EXISTING FLOOR (RATED FIRE/SMOKE DAMPERS MUST BE PROVIDED IN CASE OF ANY PENETRATING DUCTWORK).
6- ALL CONSTRUCTION AT BASEMENT LEVEL TO BE TYPE I-A AND I-B FOR IST FLOOR.
7- PROVIDE UNINTERRUPTED INSULATION UNDER THE FLOOR SLAB AND PLBG. COVER WITH PROTECTING CLG AS REQ'D.
8- ANY SPECIAL SYSTEM OF REMOVABLE EXTERIOR WALL SECTION DEVISED FOR DELIVERY/REMOVAL OF MRI EQUIPMENT MUST BE AS PER APPROVED DTLS AND FILED AS REQ'D.
9- STORAGE AND USE OF CRYOGENIC FLUIDS MUST CONFORM WITH ARTICLE 75 OF 1997 UFC. (ALL SYSTEM SUBJECT TO FIRE MARSHAL APPROVAL).
10-SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
(1/17/2005 14:56 MBW) ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
6130 SQ FT, CIFO / FRISCO IMAGING CENTER