Notes:
330 SQ FT, SALT / MASTER BATHROOM RENOVATION
4/16/2015 12:00:00 AM
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
163. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2011 NEC AND 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVAL
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2012 IRC AND 2012 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
CALL (972) 292-5386 FOR INSPECTION.
**COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND
MECHANICAL
414. * ALL DUCT WORK TO BE SEALED WITH MASTIC, WELDS, OR GASKETS; TAPES ARE NOT ALLOWED.
415. * ALL EXHAUST TO TERMINATE OUTSIDE OF THE BUILDING. PRESSURE EQUALIZATION IS REQUIRED FOR ALL EXHAUST SYSTEMS (SEE IMC 501.3).