Notes:
6922 AC, 8250 SF, SFR / 2 STORY
9/6/2005 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 28"D.
20. W/12" DIA. PIERS W/(1) #5 REBAR
27. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
GLASS At master BATH AND SHOWER MUST COMPLY WITH R308.4 OF IRC (ENCLOSED).
2nd FLOOR: 3-BED ROOMS,3-BATHS AND GAME ROOM.