Notes:
240 SQ FT, CADD / MUNI CENTER SOUTH ENTRANCE CANOPY
11/21/2012 12:00:00 AM
****SUBMITTAL OF ENGINEERED SHOP DRAWING FOR CANOPY CONSTRUCTION ARE REQUIRED, BUT DEFERED UNTIL ERRECTION.
**** ENGINEERED FOUNDATION DRAWING RECIEVED.
1. ALL WORK PERFORMED MUST MEET THE 2006 INTERNATIONAL BUILDING CODE, LOCAL AMENDMENTS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES.
3. COMPLIANCE WITH ADA/TAS REQUIREMENTS REQUIRED.
4. SUBJECT TO FIRE MARSHAL APPROVAL AND INSPECTION.
5. CONTINUOUS PROVISIONS FOR SAFEGUARDS FROM CONSTRUCTION SHALL BE ESTABLISHED AND MAINTAINED THROUGHOUT CONSTRUCTION.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTIONS REQUIRED.