Notes:
OFFICE SPACE:
1. SUBJECT TO FIELD APPROVED INSPECTIONS AND TESTING.
2. 2 HR. DEMISING WALL REQ'D. @ BUILDING SEPARATION EXITING CORRIDOR.
3. TEMPERED WINDOW/GLASS WHERE REQ'D.
4. ANY WOOD USED SHALL BE FIRE RETARDENT/TREATED.
5. INTERIOR CORRIDOR 1 HR. FIRE/SMOKE CONSTRUCTION UL-U465, FIRE CAULK FLOOR TO DECK.
DRIVE THRU:
1. ALL WORK SUBJECT TO FIELD APPROVED INSPECTIONS AND TESTING.
2. CONSTRUCTION SHALL COMPLY WITH IBC 2003.
3. DO NOT CREATE PARALLEL PATHS TO GROUND, REBAR SHALL BE BONDED BACK TO UFER GROUND.
4. ANY WOOD USED SHALL BE FIRE TREATED/RETARDENT.
3126 SQ FT, CIFO / EDS CREDIT UNION