3398 SQ FT, CIFO / PRESBYTERIAN FRISCO IMAGING CENTER
6/28/2007 12:00:00 AM
1. Med. Physicist report req'd.
2. although shielding will be installed special note should be taken to electrical/mechanical rooms being joined where MRI equipment is used. there may be current leakage and/or electromagnetic interference due to electrical xfmr's, voltage fluctuation, and related electrical equipment. a separate grounding system req'd. for MRI system. see shield design details also.
3. all work subject to field approved inspection and testing.
4. plenum rated cable is req'd.
5. vent pipe for helium magnet---any above floor penetrations shall be fire caulked.
6. mop and hi/lo sink req'd.
7. UL-U465 demising walls req'd. w/ 5/8" type X gypsum both side floor to deck.
8. tempered glass where applicable.
9. door at electrical room shall open out.
10. entry 1 hr. frame with 45 minute glass IBC 2003 T. 715.4, fire and smoke proof.
11. interior finishes: flame spread 76-200 smoke dev. 0-450
12. fully sprinkled space
13. 1013.2 exit access--shall not pass thru a room that can be locked to prevent exiting.
14. no dead-end corridors allowed. DURING PRECON MEETING, IT WAS AGREED THAT THE DOORS WOULD BE BROUGHT FORWARD (I HR. FRAME W/45 MIN. DOORS) TO PREVENT DEAD END CORRIDOR.
15. Med. Phys. report shall be req'd. and a separate permit when future CT scan room is finished out along with wall detail indicating lead lined areas.
16. 45 min. glass w/ 1 hr. frame and also 1 hr. fire rated wall construction at RM. 114 UL-U465 5/8" type X gypsum both sides floor to deck, fire caulk floor to deck. entry door shall also be 45 min. with 1 hr. frame. subject to fire marshal approval.