Notes:
10-14-05-jm)
1. door to open out at restroom.
2. valid 1 hour fire/smoke connection to mullion.
3. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal fin. floor and at deck.
4. add ADA high/low drinking fountains. two fountains are required.
5. tempered windows at storefront and at door.
6. coved tile base flooring and impervious easily cleanable floor.
7. fully sprinklered.
8. subject to field inspection approval.
(12/13/2005 08:25 CLF) PAID CEILING RED TAG BY CHECK SHOULD HAVE BEEN CREDIT CARD.
1023 SQ FT, CIFO / CELLULAR LINK