Notes:
1- CONTINGENT UPON COMPLIANCE WITH BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- PROVIDE 2 HR DEMISING WALL (WITH SOUND INSULATION) AS REQ'D FOR SEPARATION OF CLEANERS FACILITY FROM ADJACENT TENANTS.
3- THE STOREFRONT END OF RATED WALLS MUST HAVE VALID FIRE/SMOKE CONNECTION TO THE STOREFRONT'S MULLION (NOT TO GLASS) TO MEET INSPECTOR'S APPROVAL.
4- FRONT ENTRANCE PUBLIC WAITING AREA IS TO BE LIMITED TO 210 SQ. FEET AND SO IDENTIFIED BY SERVICE COUNTER. ANY EXTENSION OF THAT SPACE, OR DIFFERENT USE OF OTHER SPACES FROM WHAT PERMITTED, COULD INCREASE THE TOTAL OCCUPANCY LOAD ABOVE 15 PEOPLE AND, IN TAL CASE, REQUIRING THE ADDITION OF A SECOND TOILET AS PER CODE.
5- PENDING SUBMITTAL OF UPDATED (& GRAPHICALLY CORRECT) ARCHITECTURAL FLOOR PLAN SHOWING PROPOSED CHANGES FROM PREVIOUSLY PERMITTED SHELL STOREFRONTS (WITH ALL MULLIONS EXACTLY LOCATED) AND RELATED CONSTRUCTION DETAILS.
6- PENDING SUBMITTAL OF TDLR REGISTRATION NUMBER FOR TAS REVIEW AS REQ'D TO VALIDATE THIS PERMIT.
7- ALL CONSTRUCTION TO BE TYPE II-B (NON-COMBUSTIBLE MATERIALS) AS REQ'D.
8- NO GAS-FIRED APPLIANCES ALLOWED IN THE WORK AREA UNLESS SEPARATED BY 2 HR ENCLOSURE & APPROVED BY FIRE MARSHAL.
9- EXTERIOR WALLS TO BE BATT INSULATED R-13 (AS PER SHELL PERMIT) AND FINISHED WITH 5/8" GYP. B'D AS REQ'D.
10-MECH'L ENGR TO VERIFY IF ADEQUATE VENTILATION/EXHAUST SYSTEMS ARE PROVIDED THROUGHOUT AS REQ'D.
11-SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
(1/24/2005 08:33 MBW) ALL CONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.
2275 SQ FT, CIFO / CENTENNIAL CLEANERS & EMBROIDERY