Notes:
3 - #5'S REBAR IN THE BOTTOM OF EACH BEAM.
MEDIA ROOM NOT INCLUDED IN THIS SUBMITTAL.
2ND LEVEL INCLUDES 3 BRS, 2 BATHS, AND GAME ROOM(4/24/2004 12:14 DEB)
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
9. BEAMS=10"W X 26"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
33. MEDIA ROOM WITH CLOTHES CLOSET MUST HAVE OPERABLE WINDOW.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
51. "ASCE" REQUIRES TOP AND / OR BOTTOM BEAM REBAR PER 5.2.2.3 d.
53. ANY CHANGES FROM THE APPROVED PLAN ON FILE WITHOUT PRIOR AUTHORIZATION WILL VOID THIS PERMIT.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
58. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.
59. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BARRIER-FREE RAMP.
(4/24/2004 12:14 DEB)
60. THIS SUBMITTAL NOT IN COMPLIANCE WITH APRIL 2003 CONTRACTOR GUIDELINES.
(4/24/2004 12:14 DEB)IF MEDIA IS FINISHED OUT, SPRINKLER SYSTEM WILL HAVE TO BE INSTALLED.
4797 AC, 5811 SQ FT, SFR \ 2 STORY