Project Info
Description:
The Trails Phase 5A, Blk E, Lots 12-18 &
|
OWNER | Tipton Engineering, Inc. | (972)226-2967 | | 6330 Broadway, Suite C | Garland, Tx 75043 |
APPLICANT | Tipton Engineering, Inc. | (972)226-2967 | | 6330 Broadway, Suite C | Garland, Tx 75043 |
|
PLAT FEES |
$300.00
|
10/29/2001
|
Total Fees |
Charged: $300.00
Balance Due: $0.00
|
There are currently no inspections on this record.
There are currently no conditions on this record.