Notes:
4/22/2021 4:03:48 PM
Electrical added
4/22/2021 4:03:48 PM
PER ABO (G. URVINA) STEEL/REBAR MUST BE INSPECTED PRIOR TO POUR FOR PROPER BONDING. POOL MUST BE SECURED BY APPROVED ENCLOSURE/FENCING. ANY MODIFICATIONS TO POOL OR EQUIPMENT, EXCEPT RE-PLASTER, MUST BE APPROVED PRIOR BY CITY OF FRISCO. IF POOL WILL BE RE-PLASTERED, OBTAIN A PRE-PLASTER INSPECTION FROM HEALTH & FOOD SAFETY PRIOR TO FILLING POOL. A POOL FINAL INSPECTION IS NEEDED PRIOR TO OPENING POOL.