Notes:
POOL AND SPA
8/29/2007 12:00:00 AM
01. DUAL MAIN DRAINS REQUIRED ON EACH SUCTION LINE. MINIMUM 3' BETWEEN INSIDE EDGES OF EACH SET OF DRAIN COVERS. ALL SUCTION SUMPS MUST BE INSTALLED PRIOR TO B-STEEL INSPECTION.
02. DIVING BOARDS AND SLIDES AND THEIR ASSOCIATED ENVELOPES MUST MEET NATIONAL STANDARDS (NSPI OR CPSC) AND BE INSTALLED PER MANUFACTURER INSTRUCTIONS.
03. GAS VENT TO TERMINATE MINIMUM 5' HORIZONTAL FROM OPENABLE WINDOW OR 3' MINIMUM ABOVE.
04. WINDOWS WITHIN 36" OF WALKER OR < 5' TO WATER MUST BE TEMPERED/SAFETY GLAZED TO CODE.
05. CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
06. CONTRACTORS: INFORM HOMEOWNER OF NECESSITY FOR INSPECTORS TO ACCESS BACKYARD.
07. PATIO COVERS, ARBORS, OUTDOOR KITCHENS, BBQ GRILLS, FIRE PLACES/PITS AND FENCES REQUIRE A SEPARATE PERMIT.
08. EQUIPMENT MUST BE 3' MINIMUM FROM PROPERTY LINE. TURNOVER RATE TO BE < 6 HRS.
09. POOLS AND SPAS MUST BE DESIGNED & CONSTRUCTED IN ACCORDANCE WITH NSPI STANDARDS AND THE CURRENT IRC AS ADOPTED & AMENDED.
10. BACKWASH LINE MUST BE INSTALLED AT TIME OF TRAP INSPECTION TO INSURE PROPER AIR GAP.
11. CONTRACTOR REQUIRED TO COMPLY WITH ALL ORDINANCES. DOCUMENTATION AVAILABLE TO ASSIST YOU AT CITY OFFICES
12. PLEASE NOTE: THIS PLACARD DOES NOT INCLUDE ALL REQUIREMENTS.
13. WATER FEATURES MUST BE < 36 INCHES IN HEIGHT OR ENGINEERED.
NO PART OF POOL OR SPA BEAM MAY ENCROACH ANY EASEMENTS.
14. SIDEWALL PORT(S) (SUCTION CLEANER) MUST BE SELF CLOSING/LATCHING AND ONLY OPENED WITH THE USE OF A TOOL.
15. MUST MAINTAIN 1:1 RATIO BETWEEN FOUNDATION AND POOL/SPA.
(8/7/2007 16:35 PDC) ALL OVEREXCAVATIONS SUROUNDING FOUNDATION BEAMS SHALL BE COMPACTED SOIL TO 98% DENSITY WITH + - 3% OPTIMUM MOISTURE.