Notes:
POOL AND SPA
8/25/2005 12:00:00 AM
1. DUAL MAIN DRAINS REQUIRED WITH MINIMUM SEPERATION OF 3 FT BETWEEN INSIDE EDGES OF DRAIN COVERS.
2. DIVING BOARD AND ENVELOPE TO MEET NSPI STANDARDS.
3. TURNOVER RATE TO BE LESS THAN 6 HOURS.
4. GAS VENT TO BE 5 FT AWAY FROM ANY OPENABLE WINDOW.
5. WINDOWS WITHIN 36" OF WALKWAY OR <5' TO WATER MUST BE SAFETY GLAZED TO CODE.
6. CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
7. CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
(8/25/2005 16:05 JKT)
MUST CONFORM TO ENGINEERING LETTER.
PERMANENT ABOVE GROUND STRUCTURES (GRILL) MUST BE PERMITTED SEPARATELY
(9/9/2005 17:02 CK) * PERMIT WAS PLACED ON HOLD DUE TO ADDITIONAL ITEMS BEING CONSTRUCTED BESIDES POOL AND SPA ON POOL PERMIT...NEED TO PULL RESIDENTIAL ALT/ADD PERMIT/S.