Notes:
POOL AND SPA
7/16/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED.
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW.
TURNOVER RATE TO BE LESS THAN 6 HOURS.
Windows within 36" of walkway or <5' to water must be safety glazed to code. (7/16/2005 13:44 JRS) MAIN DRAINS MUST HAVE SEPARATION OF >3 FT BETWEEN INSIDE EDGE OF COVERS. DIVING ENVELOPE MUST MEET THE REQUIREMENTS OF THE DIVING BOARD MANUFACTURER. GAS VENT TO TERMINATE >5' FROM OPENABLE WINDOWS OR 3 FT ABOVE.