Notes:
POOL & SPA
6/21/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED.
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW.
TURNOVER RATE TO BE LESS THAN 6 HOURS.
Windows within 36" of walkway or <5' to water must be safety glazed to code. (6/21/2005 11:02 JRS) PLEASE INDICATE TURNOVER RATE IN HOURS.