Notes:
POOL ONLY
5/25/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
TURNOVER RATE TO BE LESS THAN 6 HOURS
(5/25/2005 18:38 JKT)
GAS VENT TO TERMINATE >5' FROM OPENABLE WINDOWS OR 3' ABOVE IT. WINDOWS <5' TO WATERS EDGE MUST BE SAFETY GLAZED PER CODE. GROUND ALL METAL WITHIN 5' OF WATER.