Notes:
POOL ONLY
5/14/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED.
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW.
TURNOVER RATE TO BE LESS THAN 6 HOURS.
Windows within 36" of walkway or <5' to water must be safety glazed to code. (5/14/2005 13:50 JRS) PLEASE INDICATE DUAL MAIN DRAINS ON ALL PROJECTS.