Notes:
POOL ONLY
5/5/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
TURNOVER RATE TO BE LESS THAN 6 HOURS
(5/5/2005 13:29 JKT)
GAS VENT TO TERMINATE > 5 FT FROM OPENABLE WINDOWS OR 3 FT ABOVE IT.