Notes:
POOL ONLY
5/5/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
TURNOVER RATE TO BE LESS THAN 6 HOURS
(5/5/2005 12:24 JKT)
BBQ MUST BE PERMITTED SEPERATELY. LOCATION OF POOL EQUIPMENT >5 FT. FROM WATER OR GROUND AND BONDED BARRIER REQUIRED.