Notes:
POOL AND SPA
5/4/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED.POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW. TURNOVER RATE TO BE LESS THAN 6 HOURS. (5/4/2005 11:17 JRS) PLEASE INDICATE DUAL MAIN DRAINS ON ALL PROJECTS. WINDOWS <5 FT FROM WATERS EDGE OR <36" FROM WALKWAY AROUND POOL MUST BE SAFETY GLAZED TO CODE. ENGINEER LETTER ON FILE AND APPROVED BY SC.