Notes:
POOL AND SPA
4/18/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
TURNOVER RATE TO BE LESS THAN 6 HOURS
(4/18/2005 19:20 JKT)
DUAL MAINDRAINS REQUIRED ON POOLS AND SPAS. GAS VENT TO TERMINATE >5' FROM OPENABLE WINDOWS OR 3' ABOVE IT.