Notes:
POOL AND SPA
4/19/2005 12:00:00 AM
BOARD TO MEET NSPI STANDARDS
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
DUAL MAIN DRAINS REQUIRED
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
TURNOVER RATE TO BE LESS THAN 6 HOURS
(4/19/2005 16:53 JKT)
RETAINING WALLS, GAZEBOS, AND ANY OTHER ABOVE GROUND STRUCTURE, MUST BE PERMITTED SEPERATELY. GAS VENT TO TERMINATE >5' FROM OPENABLE WINDOWS OR 3' ABOVE IT. PIERS TO BE 12" WIDTH - 3/8 REBAR AND LENGTH TO ROCK OR 15'.