Notes:
POOL AND SPA
1/17/2004 12:00:00 AM
(1/17/2004 07:19 JS)
DUAL MAIN DRAINS REQUIRED
TURNOVER RATE TO BE LESS THAN 6 HOURS
POOL EQUIPMENT TO BE 5 FEET AWAY FROM ANY OPENABLE WINDOW
BOARD TO MEET NSPI STANDARDS
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(1/17/2004 07:19 JS)SLIDE OPTION, IF CHOSEN, SHALL MEET ALL NSPI AND TDH STANDARDS.
(6/28/2003 09:22 CLF)
2. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
3. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
10. BEAMS=10"W X 26"D.
25. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
27. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
51. CSST GAS PIPING PROHIBITED IN FRISCO.
52. "ENGINEER OF RECORD" LETTER MISSING OR INCOMPLETE
59. 12 SEER ALONG WITH R-6 DUCT WORK REQ'D FOR 2000 IECC COMPLIANCE IN NON ENERGY STAR/GREEN BLDG CONSTRUCTION.