Notes:
5/22/2003 17:39 MS)
CONTRACTORS: IT IS YOUR RESPONSIBILITY TO INFORM THE HOMEOWNER OF THE NECESSITY OF INSPECTORS TO GAIN ACCESS TO THE BACKYARD.
CERTIFICATION OF POOL PROTECTION DEVICE INSTALLATION TO BE SIGNED AND ON SITE AT PRE-PLASTER INSPECTION.
(8/17/2002 07:59 CLF)
BEAMS = 10"W X 28"D.
2 OF THE 3 CAR GARAGES PARKING SPACES MUST BE 20'-0" DEEP SHEET ROCK TO SHEET ROCK.
CO DETECTORS REQUIRED--ADD TO ELECTRICAL PLAN
3 COPIES OF SITE PLAN ARE REQUIRED.
POOL & SPA