Notes:
6/12/2018 10:27:57 AM
401. ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
402. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
403. ALL DUCT WORK TO BE SEALED WITH MASTIC, WELDS, OR GASKETS; TAPES ARE NOT ALLOWED.
404. ALL EXHAUST TO TERMINATE OUTSIDE OF THE BUILDING. PRESSURE EQUALIZATION IS REQUIRED FOR ALL EXHAUST SYSTEMS (SEE IMC 501.3).
406. MECH. ENGINEER AND CONTRACTOR TO BE RESPONSIBLE FOR LOAD CALCULATIONS AND DUCT SIZING (SEE IMC SECTION 312 AND SECTION 603.2). ALL CALCULATIONS WILL BE SUBJECT TO REQUEST FOR PLAN REVIEW.
408. MECH. INSTALLATION TO COMPLY WITH THE CURRENT FRISCO AMENDMENTS (08-01-11 OF THE IMC AND IECC).
409. RIGID DUCT IS REQUIRED FOR ALL HVAC APPLICATIONS. A 6 FT (R-6) FLEX DUCT CONNECTOR IS ALLOWED BETWEEN RIGID DUCT AND CEILING DIFFUSERS.
410. PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE, INCLUDING THAT CAUSED BY SUNLIGHT, MOISTURE, EQUIPMENT MAINTENANCE, AND WIND AND SHALL PROVIDE SHIELDING FROM SOLAR RADIATION THAT CAN CAUSE DEGRADATION OF THE MATERIAL. ADHESIVE TAPE SHALL NOT BE PERMITTED.