Notes:
1/10/2018 2:29:13 PM
BUFFALO HILLS DR, BLOCK S, LOTS 1-8
GRAIN ST, BLOCK Q, LOTS 11 & 12,
MASON RIVER RD, BLOCK T, LOTS 5-8,
CHEYENNE MOON LN, BLOCK P, LOTS 32-34,
COLT CHASE RD, BLOCK T, LOTS 9-17,
BULL CREEK RD, BLOCK U, LOTS 1-5.
1/24/2018 3:35:36 PM
*****A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL OF ANY R.O.W. OR EASEMENT HELD BY THE CITY SHALL FIRST OBTAIN A PERMIT FROM THE PUBLIC WORKS R.O.W. MANAGER AND CITY UTILITY LINE LOCATES. 11300 RESEARCH ROAD (972)292-5800
A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL TO A DEPTH OF 16 OR MORE INCHES SHALL NOTIFY A TEXAS ONE CALL NOTIFICATION CENTER NOT EARLIER THAN THE 14TH DAY BEFORE THE DATE THE EXCAVATION IS TO BEGIN OR LATER THAN THE 48TH HOUR BEFORE THE TIME THE EXCAVATION IS TO BEGIN IN ACCORDANCE WITH STATE LAW (DIAL 811)
*****BUILDING INSPECTIONS PERFORMS CONTINUOUS OBSERVATION OF ALL RETAINING WALL CONSTRUCTION. PLEASE CONTACT COLE STALLCUP 214.425.4810 VSTALLCUP@FRISCOTEXAS.GOV WITH BUILDING INSPECTIONS PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
8 FT IN HEIGHT RETAINING WALL LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SHALL NOT BE LOCATED WITH ANY DEDICATED EASEMENTS.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***ENGINEERS DESIGN WILL NOT SUPPORT SURCHARGE LOADS OF BUILDINGS.
***GRADING CHANGE SHALL NOT OBSTRUCT DRAINAGE OF ADJACENT PROPERTIES.
***DRAINAGE SWALE SHALL BE LOCATED ON HIGH SIDE OF WALL WHEN WALL IS LOCATED WITHIN 1' OF PROPERTY LINE.
***GRADING SHALL COMPLY WITH ALL DETAILS OF CIVIL DESIGN DRAWINGS.
***DRAINAGE MATERIAL SHALL BE FREE OF FOREIGN DEBRIS.
***MEANS FOR RELIEF OF HYDROSTATIC PRESSURES ON WALL (DRAINAGE) REQUIRED FOR ALL WALLS IN EXCESS OF 2 FEET.