Notes:
SCREENWALL / LEXINGTON PH 1
10/28/2016 12:00:00 AM
****SECTIONS OF WALL THAT ARE BEING CONSTRUCTED ARE AS PART OF PHASE 2, 5 AND 9 ADJACENT TO SUTHERLAND ROAD. HOA LOTS MUST BE SUBSEQUENTLY PLATTED TO VALIDATE LOCATION.
*****A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL OF ANY R.O.W. OR EASEMENT HELD BY THE CITY SHALL FIRST OBTAIN A PERMIT FROM THE PUBLIC WORKS R.O.W. MANAGER. 11300 RESEARCH ROAD (972)292-5800
A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL TO A DEPTH OF 16 OR MORE INCHES SHALL NOTIFY A TEXAS ONE CALL NOTIFICATION CENTER NOT EARLIER THAN THE 14TH DAY BEFORE THE DATE THE EXCAVATION IS TO BEGIN OR LATER THAN THE 48TH HOUR BEFORE THE TIME THE EXCAVATION IS TO BEGIN IN ACCORDANCE WITH STATE LAW (DIAL 811)
BY PLAT, PUBLIC UTILITIES SHALL AT ALL TIMES HAVE THE RIGHT TO REMOVE AND KEEP ALL OR PARTS OF ANY BUILDINGS, FENCES (INCLUDING RETAINING WALLS), TREES, SHRUBS OR OTHER IMPROVEMENTS OR GROWTHS WHICH MAY IN ANY WAY ENDANGER OR INTERFERE WITH THE CONSTRUCTION, MAINTENANCE, OR EFFICIENCY OF THEIR RESPECTIVE SYSTEMS IN THE EASEMENTS.
BUILDING INSPECTIONS PERFORMS CONTINUOUS OBSERVATION OF ALL SCREENING WALL CONSTRUCTION. PLEASE CONTACT JORGE GONZALEZ 214.425.4810 WITH BUILDING INSPECTIONS PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR FOOTING AND BUILDING FINAL INSPECTION REQUIRED.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
***ALL PORTIONS OF WALL AND FENCE SHALL REMAIN ON PRIVATE PROPERTY.
***GRADING CHANGE SHALL NOT OBSTRUCT DRAINAGE OF ADJACENT PROPERTIES.
***PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***SCREENING WALL CONTRACTOR TO COORDINATE WITH ANY ASSOCIATED RETAINING WALLS TO AVOID DAMAGING DRAINAGE FIELD WITH FOUNDATION INSTALLATIONS.