Notes:
11.5 FT, RETAINING WALL REPAIR
2/15/2016 12:00:00 AM
*****A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL OF ANY R.O.W. OR EASEMENT HELD BY THE CITY SHALL FIRST OBTAIN A PERMIT FROM THE PUBLIC WORKS R.O.W. MANAGER AND CITY UTILITY LINE LOCATES. 11300 RESEARCH ROAD (972)292-5800
A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL TO A DEPTH OF 16 OR MORE INCHES SHALL NOTIFY A TEXAS ONE CALL NOTIFICATION CENTER NOT EARLIER THAN THE 14TH DAY BEFORE THE DATE THE EXCAVATION IS TO BEGIN OR LATER THAN THE 48TH HOUR BEFORE THE TIME THE EXCAVATION IS TO BEGIN IN ACCORDANCE WITH STATE LAW (DIAL 811)
*****BUILDING INSPECTIONS PERFORMS CONTINUOUS OBSERVATION OF ALL RETAINING WALL CONSTRUCTION. PLEASE CONTACT JORGE GONZALES 972.292.5470 WITH BUILDING INSPECTIONS PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
RETAINING WALL STABILIZATION LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR FOOTING AND BUILDING FINAL INSPECTION REQUIRED.
SHALL NOT BE LOCATED WITH ANY DEDICATED EASEMENTS.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***ENGINEERS DESIGN WILL NOT SUPPORT SURCHARGE LOADS OF BUILDINGS.
***FUTURE WALL MAINTENCE SHALL NOT BE THE RESPONIBILITY OF THE CITY FOR MAINTENCE OR REPLACEMENT.
***BY PLAT, PUBLIC UTILITIES SHALL AT ALL TIMES HAVE THE RIGHT TO REMOVE AND KEEP ALL OR PARTS OF ANY BUILDINGS, FENCES (INCLUDING RETAINING WALLS), TREES, SHRUBS OR OTHER IMPROVEMENTS OR GROWTHS WHICH MAY IN ANY WAY ENDANGER OR INTERFERE WITH THE CONSTRUCTION, MAINTENANCE, OR EFFICIENCY OF THEIR RESPECTIVE SYSTEMS IN THE EASEMENTS.
***FINAL ENGINEER CONSTRUCTION REPORT REQUIRED FOR PERMIT COMPLETION.