Notes:
6 FT RETAINING WALL / PARKVIEW SENIOR RESIDENCE
7/23/2015 12:00:00 AM
*****A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL OF ANY R.O.W. OR EASEMENT HELD BY THE CITY SHALL FIRST OBTAIN A PERMIT FROM THE PUBLIC WORKS R.O.W. MANAGER AND CITY UTILITY LINE LOCATES. 11300 RESEARCH ROAD (972)292-5800
A PERSON WHO INTENDS TO REMOVE OR OTHERWISE DISTURB SOIL TO A DEPTH OF 16 OR MORE INCHES SHALL NOTIFY A TEXAS ONE CALL NOTIFICATION CENTER NOT EARLIER THAN THE 14TH DAY BEFORE THE DATE THE EXCAVATION IS TO BEGIN OR LATER THAN THE 48TH HOUR BEFORE THE TIME THE EXCAVATION IS TO BEGIN IN ACCORDANCE WITH STATE LAW (DIAL 811)
*****ENGINEERING SERVICES PERFORMS CONTINUOUS OBSERVATION OF RETAINING WALL CONSTRUCTION FOR ALL ENGINEERED WALLS. PLEASE CONTACT ENGINEER INSPECTOR ASSIGNED TO PROJECT WITH PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
6 FT IN HEIGHT RETAINING WALL LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR FOOTING AND BUILDING FINAL INSPECTION REQUIRED.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***ENGINEERS DESIGN WILL NOT SUPPORT SURCHARGE LOADS OF BUILDINGS.
***GRADING CHANGE SHALL NOT OBSTRUCT DRAINAGE OF ADJACENT PROPERTIES.
***FENCE PLACEMENT NOT SHOWN. SEPARATE PERMIT REQUIRED.
***WALL FACE STONE TO MATCH BUILDING.