Permit Info
Short Description:
9.2 RETAINING WALL
Expiration Date:
2/26/2014
Notes:
9.2 RETAINING WALL
8/27/2013 12:00:00 AM
ENGINEERING CONDITIONS OF ISSUANCE:
1. Specify type of filter fabric on RW3 details.
BUILDING INSPECTIONS:
(8/27/2013 2:28 PM PDC)
*****ENGINEERING SERVICES PERFORMS CONTINUOUS OBSERVATION OF RETAINING WALL CONSTRUCTION FOR ALL ENGINEERED WALLS. PLEASE CONTACT JORGE GONZALES 972.292.5470 WITH ENGINEERING SERVICES PRIOR TO CONSTRUCTION MOBILIZATION TO COORDINATE WITH CITY STAFF FOR TIMELY OBSERVATIONS.****
9.2 FT IN HEIGHT RETAINING WALL LOCATIONS AS SPECIFIED ON SITE PLAN AND REFERENCE APPROVED PLANS.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR FOOTING AND BUILDING FINAL INSPECTION REQUIRED.
SHALL NOT BE LOCATED WITH ANY DEDICATED EASEMENTS.
LETTER OF ENGINEER FINAL ACCEPTANCE REQUIRED FOR INSPECTION AND CONSTRUCTION CONFORMANCE WITH DESIGN DRAWINGS.
PROVIDE EROSION CONTROL THROUGHOUT CONSTRUCTION. PROVIDE SOIL STABILIZATION AT COMPLETION OF PROJECT.
***FLOODWAY EASEMENT SHALL NOT BE DISTURBED OR RE-GRADED FROM EXISTING CONDITIONS.
***ENGINEERS DESIGN WILL NOT SUPPORT SURCHARGE LOADS OF BUILDINGS.
***NO PORTION OF RETAINING WALL SHALL BE LOCATED IN ADJACENT FLOODWAY EASEMENT.
***GRADING CHANGE SHALL NOT OBSTRUCT DRAINAGE OF ADJACENT PROPERTIES.
***FENCE REPLACEMENT NOT SHOWN. SEPARATE PERMIT REQUIRED.
***SUBDIVISION HOA APPROVED MAY BE REQUIRED.
*** ENGINEER OF RECORD CREATING PLAT SHALL PROVIDE SCREENING WALL MAINTENANCE EASEMENT FOR ALL SECTIONS NOT LOCATED WITHIN H.O.A SCREENING AND LANDSCAPE DESIGNATION.
***DRAINAGE SWALE SHALL BE LOCATED ON HIGH SIDE OF WALL WHEN WALL IS LOCATED WITHIN 1' OF PROPERTY LINE.
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
QUAIL MEADOW VILLAGE, PH 3
|
OWNER | LENNAR HOMES | (469)587-5200 | dfwpermits@lennar.com | | IRVING, TX 75063 |
APPLICANT | RPM X CONSTRUCTION | (214)239-4722 | bpenz@rpmxconstruction.com | | PLANO, TX 75024 |
CONTRACTOR | RPM X CONSTRUCTION | (214)239-4722 | bpenz@rpmxconstruction.com | | PLANO, TX 75024 |
|
FENCE FEE |
$20.00
|
8/30/2013
|
Total Fees |
Charged: $20.00
Balance Due: $0.00
|
There are currently no inspections on this record.
|
FENCE REVIEW | Phillip Climer | APPROVED | 8/12/2013 | 8/27/2013 | 8/26/2013 |
More Info
|