Notes:
12/30/2019 1:34:39 PM
1- All work performed must meet the 2014 NEC and 2015 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city ordinances.
2- Minimum #12 copper conductors permitted except for controls.
3- No aluminum wire permitted or #14 LEC3 energy requirement required for additions.
4- Engineers letters of acceptance for framing and flooring system required prior to the City of Frisco frame inspection.
5- Subject to field inspection approval. Call (972) 292-5386 for inspection.
6- City of Frisco approval is not in lieu of homeowner association HOA requirements. Reference HOA bylaws for subdivision requirements.