Notes:
METER FOR LIGHTING AND SIGNS
2/23/2015 12:00:00 AM
METER FOR FUTURE LIGHTING AND SIGN.
SEPERATE ELECTRICAL PERMIT IS REQUIRED TO INTALL LIGHTING AND SIGN PERMIT REQUIRED FOR SIGNAGE.
ALL WORK PERFORMED MUST MEET THE 2011 NEC AND 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
CALL (972) 292-5386 FOR INSPECTION.