Notes:
(1/20/2009 15:29 JC)
SOLAR PANEL(S) INSTALLATION
Permit is issued contingent upon (2) inspections- during installation and upon completion of the work.
Work is to proformed under current code requirements for structural loading, electrical and life safety.
Required inspections, installer requested, are included within the permit fee.
Installation per the submitted drawings, vendor cut sheets and placement location indicated with developer approval.
SOLAR PANELS