Permit Info
Short Description:
1 BF FIRE**MODEL**5624 AC, 7108 SF, SFR / 2 STORY
Expiration Date:
8/21/2018
Notes:
1 BF FIRE**MODEL**5624 AC, 7108 SF, SFR / 2 STORY
6/13/2017 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
006. MAX STRUCTURE HIEGHT FROM AVG FINISH GRADE 40'-0".
013. BEAMS=10"W X 26"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
034. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
044. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
048. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
054. LETTERS OF ACCEPTANCE FOR FOUNDATION & FRAME REQUIRED FROM BOTH ENGINEERS FOR CO.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
(6/13/2017 8:07 AM JC)
(FWF)
Study with a door into the (1) car garage must never be used as a sleeping room per code requirement.
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
EDGESTONE AT LEGACY PHASE 1
|
BF TESTER | PARKER EAKINS | (214)701-1057 | backflow@gsfireprotectionllc.com | 1260 STACY RD | FAIRVIEW, TX 75069 |
OWNER | TOLL BROTHERS INC | (469)525-0524 | TexasStarts@tollbrothersinc.com | 2557 SW GRAPEVINE PARKWAY #100 | Frisco, TX 75034 |
APPLICANT | TOLL BROTHERS INC | (469)525-0524 | TexasStarts@tollbrothersinc.com | 2557 SW GRAPEVINE PARKWAY #100 | Frisco, TX 75034 |
CONTRACTOR | TOLL BROTHERS INC | (469)525-0524 | TexasStarts@tollbrothersinc.com | 2557 SW GRAPEVINE PARKWAY #100 | Frisco, TX 75034 |
ELECT. CTR. | C & B ELECTRIC / LARRY CAUSEY INC | (972)790-0707 | clindow@cbeltx.com | | GRAND PRAIRIE, TX 75050 |
ENGINEER | D & E STRUCTURES CONSULTING ENGINEERS | (214)741-3095 | SDICKSON@DE-STRUCTURES.COM | | RICHARDSON, TX 75081 |
FIRE CONTACT | GS FIRE PROTECTION, LLC | (214)701-1057 | BACKFLOW@GSFIREPROTECTIONLLC.COM | 125 Richardson | ALLEN, TX 75002 |
HERS PROVIDE | FOX ENERGY SPECIALIST / THE NELROD CO | (817)546-0160 | DLYONS@FOX-ENERGY.COM | | FORT WORTH, TX 76109 |
MECH. CTR. | RELIANT ENERGY RETAIL SERVICES | (713)683-7426 | cheryl.poltorak@nrg.com | | HOUSTON, TX 77055 |
PLUM. CONT. | HORIZON PLUMBING | (817)461-1117 | POBRIANT@HORIZONPLUMBING.NET | | ARLINGTON, TX 76013 |
STRUCT ENG | D & E STRUCTURES CONSULTING ENGINEERS | (214)741-3095 | SDICKSON@DE-STRUCTURES.COM | | RICHARDSON, TX 75081 |
|
BACK FLOW FORM REVIEW |
$25.00
|
9/5/2017
|
Total Fees |
Charged: $25.00
Balance Due: $0.00
|
|
BACKFLOW | APPROVED |
8/21/2017
| | 8/21/2017 | |
More Info
|
There are currently no reviews on this record.