Permit Info
Short Description:
1 BF WATER SOFTENER, 3964 AC, 4643 SF, SFR / 2 STORY
Expiration Date:
5/13/2019
Notes:
1 BF WATER SOFTENER, 3964 AC, 4643 SF, SFR / 2 STORY
5/19/2015 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED (06/18/13) ZONING ORDINANCE.
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
014. BEAMS=10"W X 28"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
045. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
046. SECOND STORY WINDOWS (SIZE & TYPE) MUST INCLUDE HEAD HEIGHT
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND & ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
055. WRITTEN COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO IN THE PERMIT POUCH.
056. LANDSCAPE IRRIGATION SYSTEM REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
057. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
Parcel Info
City/State/Zip:
FRISCO, TX, 75035
Subdivision:
RIDGEVIEW AT PANTHER CREEK #2 (CFR)
|
BF TESTER | SHERMAN DOBBS | (469)500-5506 | SEDOBBS1@GMAIL.COM | 16308 DRY CREEK BLVD | PROSPER, TX 75078 |
OWNER | SACHDEVA GAURAV & MEGHA KALIA | ()- | | | FRISCO, TX 75035-0859 |
MAIL TO | SACHDEVA GAURAV & MEGHA KALIA | ()- | | | FRISCO, TX 75035-0859 |
APPLICANT | FIRST TEXAS CUSTOM HOMES | (214)613-3400 | AGUTIERREZ@FIRSTTEXASHOMES.COM | | DALLAS, TX 75201 |
CONTRACTOR | FIRST TEXAS CUSTOM HOMES | (214)613-3400 | AGUTIERREZ@FIRSTTEXASHOMES.COM | | DALLAS, TX 75201 |
ELECT. CTR. | IES RESIDENTIAL INC | (972)562-7724 | brian.hartley@ies-co.com | | MCKINNEY, TX 75069 |
HERS PROVIDE | METRO CODE ANALYSIS | (817)335-1497 | jkillebrew@metrocode.com | | FT WORTH, TX 76116 |
MECH. CTR. | MATCO HVAC INC | (817)313-7333 | SALES@MATCOAIR.COM | | WATAUGA, TX 76148 |
PLUM. CONT. | L & S PLUMBING | (972)331-6850 | dthompson@lsmech.com | | RICHARDSON, 75081 |
STRUCT ENG | ERIC L DAVIS ENGINEERING, INC | (972)564-0592 | ericdavis@eldengineering.com | P O BOX 2637 | FORNEY, TX 75126 |
|
BACK FLOW FORM REVIEW |
$25.00
|
5/30/2018
|
BACK FLOW FORM REVIEW |
$25.00
|
6/6/2017
|
Total Fees |
Charged: $50.00
Balance Due: $0.00
|
|
BACKFLOW | APPROVED |
5/30/2018
| | 5/30/2018 | |
More Info
|
BACKFLOW | APPROVED |
6/6/2017
| | 6/6/2017 | |
More Info
|
BACKFLOW | APPROVED |
5/13/2016
| | 5/13/2016 | |
More Info
|
There are currently no reviews on this record.