Permit Info
Short Description:
1 BF -WATER SOFTENER 3801 AC, 4597 SF, SFR / 2 STORY
Expiration Date:
3/17/2019
Notes:
1 BF -WATER SOFTENER 3801 AC, 4597 SF, SFR / 2 STORY
3/25/2013 12:00:00 AM
001. COMPLIANCE WITH THE APRIL 5, 2011 ZONING ORDINANCE REQUIRED.
002. COMPLIANCE WITH THE 2006 BUILDING CODES, AMENDMENT AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
010. BEAMS=10"W X 28"D.
022. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION.
034. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
041. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS-MINIMUM PITCH 2:12.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
043. COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D. BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER ENCLOSED SHEET (CZO PG 188).
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
2ND FLOOR: 3BR, 2BA, GAME, MEDIA
Parcel Info
City/State/Zip:
FRISCO, TX, 75035
Subdivision:
ARBOR AT LAWLER PARK #1, THE (CFR)
|
BF TESTER | CHAD ADLER | (972)699-7156 | ADLERWATERWORKS@GMAIL.COM | 11305 KNOXVILLE LN | FRISCO, TX 75035 |
OWNER | VON FELDT GERALD JR & | ()- | | ANITA BESSER VON FELDT | FRISCO, TX 75035-0581 |
MAIL TO | VON FELDT GERALD JR & | ()- | | ANITA BESSER VON FELDT | FRISCO, TX 75035-0581 |
APPLICANT | HIGHLAND HOMES | (972)789-3500 | cbagley@hhomesltd.com | | PLANO, TX 75024 |
CONTRACTOR | HIGHLAND HOMES | (972)789-3500 | cbagley@hhomesltd.com | | PLANO, TX 75024 |
ELECT. CTR. | IES RESIDENTIAL INC | (972)562-7724 | brian.hartley@ies-co.com | | MCKINNEY, TX 75069 |
HERS PROVIDE | FOX ENERGY SPECIALIST | (817)922-9000 | DLYONS@FOX-ENERGY.COM | | FORT WORTH, TX 76109 |
MECH. CTR. | ADVENT AIR CONDITIONING INC | (972)221-4373 | aramon@adventair.com | | LEWISVILLE, TX 75057 |
PLUM. CONT. | PROFESSIONAL PLUMBERS GROUP IN | (972)429-5575 | GCOKER@PLUMBERSGROUP.COM | | WYLIE, TX 75098 |
STRUCT ENG | ERIC L DAVIS ENGINEERING, INC | (972)564-0592 | ericdavis@eldengineering.com | P O BOX 2637 | FORNEY, TX 75126 |
|
BACK FLOW FORM REVIEW |
$25.00
|
5/5/2017
|
BACK FLOW FORM REVIEW |
$25.00
|
4/12/2018
|
Total Fees |
Charged: $50.00
Balance Due: $0.00
|
|
BACKFLOW | APPROVED |
4/6/2018
| | 4/6/2018 | |
More Info
|
BACKFLOW | APPROVED |
5/1/2017
| | 5/1/2017 | |
More Info
|
BACKFLOW | APPROVED |
3/17/2016
| | 3/17/2016 | |
More Info
|
There are currently no reviews on this record.