Permit Info
Short Description:
1 BF -WATER SOFT 3337 AC, 4013 SF, SFR / 2 STORY
Expiration Date:
12/13/2018
Notes:
1 BF -WATER SOFT 3337 AC, 4013 SF, SFR / 2 STORY
3/27/2013 12:00:00 AM
001. COMPLIANCE WITH THE APRIL 5, 2011 ZONING ORDINANCE REQUIRED.
002. COMPLIANCE WITH THE 2006 BUILDING CODES, AMENDMENT AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
012. BEAMS=10"W X 30"D.
022. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION.
038. RETAINING WALLS TWO (2) FT OR TALLER MUST BE OF ENGINEERED DESIGN.
039. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
043. COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D. BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24".
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
2ND FLOOR: 3BR, 2BA, GAME, DRYBAR
Parcel Info
City/State/Zip:
FRISCO, TX, 75035
Subdivision:
ARBORS AT WILLOW BAY PHASE II, THE (CFR)
|
BF TESTER | SANJAY CHANDRAHAS | (214)738-5657 | | 2031 CACISEO WAY | ALLEN, TX 75013 |
OWNER | YANALA PRADEEP REDDY & KAVITHA SAMA | ()- | | | FRISCO, TX 75035-6818 |
MAIL TO | YANALA PRADEEP REDDY & KAVITHA SAMA | ()- | | | FRISCO, TX 75035-6818 |
APPLICANT | HIGHLAND HOMES | (972)789-3500 | cbagley@hhomesltd.com | | PLANO, TX 75024 |
CONTRACTOR | HIGHLAND HOMES | (972)789-3500 | cbagley@hhomesltd.com | | PLANO, TX 75024 |
ELECT. CTR. | IES RESIDENTIAL INC | (972)562-7724 | brian.hartley@ies-co.com | | MCKINNEY, TX 75069 |
HERS PROVIDE | FOX ENERGY SPECIALIST | (817)922-9000 | DLYONS@FOX-ENERGY.COM | | FORT WORTH, TX 76109 |
MECH. CTR. | HOUK AIR CONDITIONING | (817)265-1191 | CGORE@HOUKAC.COM | | ARLINGTON, TX 76010 |
PLUM. CONT. | PROFESSIONAL PLUMBERS GROUP IN | (972)429-5575 | GCOKER@PLUMBERSGROUP.COM | | WYLIE, TX 75098 |
STRUCT ENG | ERIC L DAVIS ENGINEERING, INC | (972)564-0592 | ericdavis@eldengineering.com | P O BOX 2637 | FORNEY, TX 75126 |
|
BACK FLOW FORM REVIEW |
$25.00
|
12/8/2017
|
Total Fees |
Charged: $25.00
Balance Due: $0.00
|
|
BACKFLOW | APPROVED |
12/8/2017
| | 12/8/2017 | |
More Info
|
BACKFLOW | APPROVED |
12/13/2016
| | 12/13/2016 | |
More Info
|
There are currently no reviews on this record.