Permit Info
Short Description:
3792 AC, 4162 SF, SFR / 2 STORY
Notes:
(3/31/2011 3:50 PM JC)
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
010. BEAMS=10"W X 28"D.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
033. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
037. DRIVEWAY SLOPE MUST NOT EXCEED 12% - PLOT PLANS W/GRADES REQUIRED.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
043. COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D. BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO.
044. CO DETECTORS REQ'D ON ELECTRICAL LEGEND & ELECTRICAL PLAN 1/1000 SQ. FT. & 1 PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
3792 AC, 4162 SF, SFR / 2 STORY
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
COBB FARM PH 2
|
BF TESTER | CHRIS JONES | (214)597-1760 | | 1931 MIDDLE GLEN DR | CARROLLTON, TX 75007 |
OWNER | BEAZER HOMES | (972)250-3821 | | 501 W. George Bush Hwy, #100 | Richardson, TX 75080 |
APPLICANT | BEAZER HOMES | (972)250-3821 | | 501 W. George Bush Hwy, #100 | Richardson, TX 75080 |
CONTRACTOR | BEAZER HOMES | (972)250-3821 | | 501 W. George Bush Hwy, #100 | Richardson, TX 75080 |
ELECT. CTR. | SORENSON ELECTRIC | (972)578-9395 | SUSAN@SORENSENELECTRIC.COM | 1770 MILLARD SUITE D | PLANO, TX 75074 |
HERS PROVIDE | BURGESS CONSTRUCTION CONSULTAN | (214)291-3141 | CBROOKS@BURGESS-INC.COM | 1255 W 15TH STE 100 | PLANO, TX 75075 |
MECH. CTR. | AIRTRON INC | (972)272-9633 | CHERRI.GAINS@RESSERVICES.COM | 9525 FORESTVIEW STREET | DALLAS, TX 75243 |
PLUM. CONT. | ENTERPRISE PLUMBING | (972)231-2860 | joed@enterplumb.com | 900 ALPHA #430 | RICHARDSON, TX 75081 |
STRUCT ENG | ERIC L. DAVIS ENGINEERING, INC | (972)564-0592 | ericdavis@eldengineering.com | P O BOX 2637 | FORNEY, TX 75126 |
Total Fees |
Charged: $0.00
Balance Due: $0.00
|
|
BACKFLOW | APPROVED |
8/25/2011
| | 8/25/2011 | |
More Info
|
There are currently no reviews on this record.