Permit Info
Short Description:
4253 AC, 5028 SF, SFR / 2 STORY
Notes:
4253 AC, 5028 SF, SFR / 2 STORY
11/17/2009 12:00:00 AM
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
012. BEAMS=10"W X 30"D.
025. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
026. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
027. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
028. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
034. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
037. DRIVEWAY SLOPE MUST NOT EXCEED 12% - PLOT PLANS W/GRADES REQUIRED.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
2nd FLOOR: 3-BED ROOMS, 2-BATHS, GAME ROOM AND MEDIA & A WET BAR.
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
CHRISTIE RANCH PH 1C
|
OWNER | JPA DEVELOPMENT CORPORATION | (972)473-2018 | shanehausier@gmail.com | 5968 TIPPERARY | PLANO, TX 75093 |
MAIL TO | JPA DEVELOPMENT CORPORATION | (972)333-6407 | jphomes@mac.com | 5729 LEBANON DR #144-201 | FRISCO, TX 75034 |
APPLICANT | JPA DEVELOPMENT CORPORATION | (972)473-2018 | shanehausier@gmail.com | 5968 TIPPERARY | PLANO, TX 75093 |
CONTRACTOR | JPA DEVELOPMENT CORPORATION | (972)473-2018 | shanehausier@gmail.com | 5968 TIPPERARY | PLANO, TX 75093 |
ELECT. CTR. | ARI-TEX ELECTRIC INC | (972)727-9902 | SERVICECARI-TEX.COM | 606 CENTRAL EXPRESSWAY | ALLEN, TX 75013 |
MECH. CTR. | KRUGER & SON HEATING & AIR | (972)271-9319 | | 2166 S JUPITER | GARLAND, TX 75041 |
PLUM. CONT. | ENTERPRISE PLUMBING | (972)231-2860 | | 900 ALPHA #430 | RICHARDSON, TX 75081 |
STRUCT ENG | PARAGON STRUCTURAL ENGINEERING | (214)477-4737 | brian@pseglobal.com | 7148 SILVERBROOK LN | Frisco, Tx 75034 |
|
BACK FLOW FORM REVIEW |
$25.00
|
4/6/2010
|
Total Fees |
Charged: $25.00
Balance Due: $0.00
|
There are currently no reviews on this record.