Permit Info
Short Description:
200 SF, PATIO COVER/ARBOR
Approved Date:
11/17/2021
Expiration Date:
7/27/2022
Notes:
11/17/2021 11:45:22 AM
PATIO COVER/ARBOR
All work performed must meet the 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
Need a flatwork inspection before the pour.
NO plumbing requested or permitTed.
Patio Cover to stop at the TWENTY (20) foot build line and the Outside post of the Arbor should be minimum TWELVE (12) foot from rear property line. An over-hang of up to three (3) foot is allowed.
May not adversely affect drainage of neighboring properties.
Lag bolt must penetrate main house stud min 1 ½".
Compliance with section R905 of the 2018 IRC for roof coverings required.
Subject to field inspection approval. Request inspections online at https://etrakit.friscotexas.gov until 7:00 AM same day.
City of Frisco approval is not in lieu of homeowner association HOA requirements. reference HOA bylaws for subdivision requirements.
Parcel Info
City/State/Zip:
FRISCO, TX, 75068
Subdivision:
ESTATES AT ROCKHILL PHASE I
|
APPLICANT | Michael Valderas | (214)543-4902 | qthomerepair@gmail.com | 307 Bronco Trail, Little Elm, TX, USA | Little Elm, TX 75068 |
OWNER | SHURN, FELECIA | ()- | | | LITTLE ELM, TX 75068 |
CONTRACTOR | QUALITY TOUCH HOME REPAIR | (214)543-4902 | QTHOMEREPAIR@GMAIL.COM | 307 BRONCO TRAIL | LITTLE ELM, TX 75068 |
|
RESIDENTIAL ACCESSORY STRUCTURE |
$173.00
|
11/17/2021
|
CREDIT CARD FEE |
$0.60
|
1/26/2022
|
AUTO PROCESSING FEE |
$3.46
|
11/17/2021
|
RESIDENTIAL ACCESSORY APPLICATION FEE |
$20.00
|
10/28/2021
|
AUTO PROCESSING FEE |
$0.40
|
10/28/2021
|
MISC FRAME RES 01/10/2022 BC |
$30.00
|
1/26/2022
|
Total Fees |
Charged: $227.46
Balance Due: $0.00
|
|
MISC FINAL RES | APPROVED |
1/28/2022
| | 1/28/2022 | |
More Info
|
MISC FINAL RES | RES FAILED |
1/21/2022
| | 1/21/2022 | |
More Info
|
MISC FINAL RES | RES FAILED |
1/19/2022
| | 1/19/2022 | |
More Info
|
MISC FINAL RES | RES FAILED |
1/14/2022
| | 1/14/2022 | |
More Info
|
MISC FRAME RES | RES FAILED |
1/10/2022
| | 1/10/2022 | |
More Info
|
There are currently no reviews on this record.