Permit Info
Short Description:
567377 SF / REMY
Expiration Date:
2/19/2025
Parcel Info
City/State/Zip:
FRISCO, TX, 75034
Subdivision:
FRISCO SQUARE RESIDENTIAL (CFR)
|
APPLICANT | Anna Eggert | (203)598-1607 | aeggert@tollbrothers.com | 14643 Dallas Parkway | Dallas, TX 75254 |
OWNER | TB GORDON ST LLC | ()- | | C/O TOLL BROTHERS INC | FORT WASHINGTON, PA 19034-3204 |
CONTRACTOR | KWA CONSTRUCTION | (214)978-0177 | HWEBSTER@KWACONSTRUCTION.COM | 16800 WESTGROVE DR SUTE 300 | ADDISON, TX 75001 |
ELECT. CTR. | EMS Electrical, LLC | (469)955-1923 | rosy@ems-electrical.com | 805 Luke Street | Irving, TX 75061 |
PLUM. CTR. | LONGHORN MECHANICAL (PLUM) | (903)482-6586 | DFRENCH@LONGHORNMECH.NET | PO BOX 909 | VAN ALSTYNE, TX 75495 |
|
6 INCH COMP METER |
$5,290.00
|
10/13/2022
|
WATER METER DEPOSIT COMMERCIAL |
$1,100.00
|
10/13/2022
|
PERCENT CREDIT CARD FEE |
$0.70
|
9/11/2023
|
AUTO PROCESSING FEE |
$6.00
|
3/19/2021
|
COMMERCIAL FEE |
$22,725.08
|
1/24/2022
|
COMMERCIAL BUILDING PERMIT FEE |
$95,811.33
|
1/24/2022
|
COMMERCIAL MECHANICAL FEE |
$28,398.85
|
1/24/2022
|
COMMERCIAL NEW APPLICATION FEE |
$300.00
|
3/19/2021
|
COMMERCIAL PLUMBING FEE |
$51,093.93
|
1/24/2022
|
SEWER IMPACT FEE |
$90,396.00
|
1/24/2022
|
THOROUGHFARE IMPACT FEE |
$0.00
|
|
WATER IMPACT FEE |
$91,446.00
|
1/24/2022
|
SLAB COMM 06/07/2022 REED |
$35.00
|
10/13/2022
|
PLUMBING ROUGH-IN 12/01/2022 SDC |
$35.00
|
9/11/2023
|
MECHANICAL ROUGH 10/10/2023 SDC |
$35.00
|
|
MECHANICAL ROUGH 10/17/2023 SDC |
$35.00
|
|
Total Fees |
Charged: $386,707.89
Balance Due: $70.00
|
|
COMM CO | |
9/23/2024
| | | |
More Info
|
COMM CO | TEMP CO |
8/23/2024
| | 8/23/2024 | |
More Info
|
MEETING | |
8/15/2024
| 10:00 AM | | |
More Info
|
GAS PRESSURE | APPROVED |
8/5/2024
| | 8/5/2024 | |
More Info
|
COMM CO | TEMP CO |
7/24/2024
| | 7/24/2024 | |
More Info
|
COMM CO | TEMP CO |
6/24/2024
| | 6/24/2024 | |
More Info
|
FIRE FINAL | PARTIAL APPROVAL |
6/21/2024
| 8:00 AM | 6/21/2024 | 11:30 AM |
More Info
|
FOOTINGS COMM | APPROVED |
6/21/2024
| | 6/21/2024 | |
More Info
|
CONSTRUCTION SAFETY | COMPLETED |
6/11/2024
| | 6/12/2024 | |
More Info
|
FIRE FINAL | FIRE FAILED |
6/11/2024
| 8:00 AM | 6/12/2024 | |
More Info
|
COMM CO | TEMP CO |
6/6/2024
| | 6/6/2024 | |
More Info
|
INSULATION COMM | APPROVED |
6/4/2024
| | 6/4/2024 | |
More Info
|
FIREINSULATION | APPROVED |
6/4/2024
| 10:00 AM | 6/5/2024 | |
More Info
|
MECHANICAL FINAL | APPROVED |
5/24/2024
| | 5/24/2024 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/23/2024
| | 5/23/2024 | |
More Info
|
FRAME COMM | APPROVED |
5/23/2024
| | 5/23/2024 | |
More Info
|
MECHANICAL FINAL | CANCELLED |
5/22/2024
| | 5/22/2024 | |
More Info
|
MECHANICAL FINAL | APPROVED |
5/21/2024
| | 5/21/2024 | |
More Info
|
DRYWALL COMM | APPROVED |
5/21/2024
| | 5/21/2024 | |
More Info
|
DRYWALL COMM | CANCELLED |
5/20/2024
| | 5/20/2024 | |
More Info
|
MECHANICAL FINAL | COMM FAILED |
5/17/2024
| | 5/17/2024 | |
More Info
|
MECHANICAL FINAL | COMM FAILED |
5/17/2024
| | 5/17/2024 | |
More Info
|
FIREINSULATION | ACCEPTED |
5/13/2024
| 1:30 PM | 5/13/2024 | 2:30 PM |
More Info
|
INSPECTION ASSIST | COMPLETED |
5/13/2024
| 1:30 PM | 5/13/2024 | 2:30 PM |
More Info
|
COMM CO | TEMP CO |
5/10/2024
| | 5/10/2024 | |
More Info
|
DRYWALL COMM | APPROVED |
5/10/2024
| | 5/10/2024 | |
More Info
|
MEETING | COMPLETED |
5/10/2024
| 1:30 PM | 5/10/2024 | |
More Info
|
MEETING | COMPLETED |
5/10/2024
| 1:30 PM | 5/10/2024 | |
More Info
|
INSULATION COMM | APPROVED |
5/7/2024
| | 5/7/2024 | |
More Info
|
DRYWALL COMM | APPROVED |
5/7/2024
| | 5/7/2024 | |
More Info
|
FIREINSULATION | FIRE FAILED |
5/1/2024
| 8:00 AM | 5/1/2024 | |
More Info
|
CONSTRUCTION SAFETY | FIRE FAILED |
5/1/2024
| | 5/2/2024 | |
More Info
|
INSULATION COMM | APPROVED |
4/26/2024
| | 4/26/2024 | |
More Info
|
LATH COMM | APPROVED |
4/26/2024
| | 4/26/2024 | |
More Info
|
INSULATION COMM | APPROVED |
4/26/2024
| | 4/26/2024 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/18/2024
| | 4/18/2024 | |
More Info
|
FRAME COMM | APPROVED |
4/18/2024
| | 4/18/2024 | |
More Info
|
ELECT RELEASE COMM | APPROVED |
4/17/2024
| | 4/17/2024 | |
More Info
|
COMM CO | TEMP CO |
4/10/2024
| | 4/10/2024 | |
More Info
|
PLUMBING FINAL | APPROVED |
4/10/2024
| | 4/10/2024 | |
More Info
|
MECHANICAL FINAL | CANCELLED |
4/10/2024
| | 4/10/2024 | |
More Info
|
BUILDING FINAL | APPROVED |
4/9/2024
| | 4/9/2024 | |
More Info
|
BUILDING FINAL | APPROVED |
4/5/2024
| | 4/5/2024 | |
More Info
|
ELECT FINAL COMM | APPROVED |
4/5/2024
| | 4/5/2024 | |
More Info
|
ELECT FINAL COMM | APPROVED |
4/5/2024
| | 4/5/2024 | |
More Info
|
COMM CO | COMM FAILED |
4/5/2024
| | 4/5/2024 | |
More Info
|
COMM CO | COMM FAILED |
4/5/2024
| | 4/5/2024 | |
More Info
|
INSPECTION ASSIST | |
4/4/2024
| 9:00 AM | | |
More Info
|
FIRE FINAL | PARTIAL APPROVAL |
4/4/2024
| 8:00 AM | 4/9/2024 | |
More Info
|
MECHANICAL FINAL | APPROVED |
4/3/2024
| | 4/3/2024 | |
More Info
|
PLUMBING FINAL | APPROVED |
4/2/2024
| | 4/2/2024 | |
More Info
|
PLUMBING FINAL | APPROVED |
4/1/2024
| | 4/1/2024 | |
More Info
|
BUILDING FINAL | APPROVED |
3/28/2024
| | 3/28/2024 | |
More Info
|
MECHANICAL FINAL | APPROVED |
3/26/2024
| | 3/26/2024 | |
More Info
|
PLUMBING FINAL | APPROVED |
3/26/2024
| | 3/26/2024 | |
More Info
|
MECHANICAL FINAL | COMM FAILED |
3/25/2024
| | 3/25/2024 | |
More Info
|
PLUMBING FINAL | COMM FAILED |
3/25/2024
| | 3/25/2024 | |
More Info
|
CONSTRUCTION SAFETY | FIRE FAILED |
3/22/2024
| 10:00 AM | 3/22/2024 | 11:00 AM |
More Info
|
PLUMBING FINAL | COMM FAILED |
3/22/2024
| | 3/22/2024 | |
More Info
|
MECHANICAL FINAL | COMM FAILED |
3/22/2024
| | 3/22/2024 | |
More Info
|
ELECT FINAL COMM | APPROVED |
3/22/2024
| | 3/22/2024 | |
More Info
|
BUILDING FINAL | APPROVED |
3/22/2024
| | 3/22/2024 | |
More Info
|
MEETING | COMPLETED |
3/20/2024
| 8:00 AM | 3/20/2024 | |
More Info
|
FIREINSULATION | APPROVED |
3/20/2024
| 8:00 AM | 3/20/2024 | |
More Info
|
MECHANICAL FINAL | APPROVED |
3/19/2024
| | 3/19/2024 | |
More Info
|
PLUMBING FINAL | APPROVED |
3/19/2024
| | 3/19/2024 | |
More Info
|
ELECT FINAL COMM | APPROVED |
3/19/2024
| | 3/19/2024 | |
More Info
|
BUILDING FINAL | COMPLETED |
3/18/2024
| | 3/18/2024 | |
More Info
|
LATH COMM | APPROVED |
3/15/2024
| | 3/15/2024 | |
More Info
|
FIREINSULATION | APPROVED |
3/15/2024
| 9:00 AM | 3/15/2024 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
3/11/2024
| | 3/11/2024 | |
More Info
|
FRAME COMM | APPROVED |
3/11/2024
| | 3/11/2024 | |
More Info
|
LATH COMM | APPROVED |
3/5/2024
| | 3/5/2024 | |
More Info
|
MECHANICAL FINAL | APPROVED |
2/29/2024
| | 2/29/2024 | |
More Info
|
PLUMBING FINAL | APPROVED |
2/28/2024
| | 2/28/2024 | |
More Info
|
ELECT FINAL COMM | APPROVED |
2/28/2024
| | 2/28/2024 | |
More Info
|
GAS RELEASE | APPROVED |
2/27/2024
| | 2/27/2024 | |
More Info
|
INSULATION COMM | APPROVED |
2/23/2024
| | 2/23/2024 | |
More Info
|
CONSTRUCTION SAFETY | FIRE FAILED |
2/23/2024
| | 2/27/2024 | |
More Info
|
LATH COMM | APPROVED |
2/14/2024
| | 2/14/2024 | |
More Info
|
FRAME COMM | APPROVED |
2/9/2024
| | 2/9/2024 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
2/9/2024
| | 2/9/2024 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
12/7/2023
| | 12/7/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
12/7/2023
| | 12/7/2023 | |
More Info
|
LATH COMM | APPROVED |
11/22/2023
| | 11/22/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
11/13/2023
| | 11/13/2023 | |
More Info
|
INSULATION COMM | APPROVED |
11/2/2023
| | 11/2/2023 | |
More Info
|
INSULATION COMM | APPROVED |
11/2/2023
| | 11/2/2023 | |
More Info
|
FIREINSULATION | APPROVED |
11/2/2023
| 1:30 PM | 11/3/2023 | |
More Info
|
FRAME COMM | APPROVED |
10/25/2023
| | 10/25/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
10/25/2023
| | 10/25/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
10/23/2023
| | 10/23/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
10/23/2023
| | 10/23/2023 | |
More Info
|
FRAME COMM | APPROVED |
10/23/2023
| | 10/23/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
10/17/2023
| | 10/17/2023 | |
More Info
|
BRICKWALL TIE COMM | APPROVED |
10/17/2023
| | 10/17/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
10/16/2023
| | 10/16/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
10/16/2023
| | 10/16/2023 | |
More Info
|
FRAME COMM | APPROVED |
10/16/2023
| | 10/16/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
10/16/2023
| | 10/16/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
10/13/2023
| | 10/13/2023 | |
More Info
|
DRYWALL COMM | COMM FAILED |
10/12/2023
| | 10/12/2023 | |
More Info
|
MECHANICAL ROUGH | CANCELLED |
10/10/2023
| | 10/10/2023 | |
More Info
|
MECHANICAL ROUGH | COMM FAILED |
10/10/2023
| | 10/10/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
10/6/2023
| | 10/6/2023 | |
More Info
|
MECHANICAL ROUGH | COMM FAILED |
10/6/2023
| | 10/6/2023 | |
More Info
|
ELECT RELEASE COMM | APPROVED |
10/5/2023
| | 10/5/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
9/28/2023
| | 9/28/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
9/26/2023
| | 9/26/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
9/25/2023
| | 9/25/2023 | |
More Info
|
ELECT RELEASE COMM | APPROVED |
9/25/2023
| | 9/25/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
9/22/2023
| | 9/22/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
9/20/2023
| | 9/20/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
9/18/2023
| | 9/18/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
9/12/2023
| | 9/12/2023 | |
More Info
|
LATH COMM | APPROVED |
9/12/2023
| | 9/12/2023 | |
More Info
|
FIREINSULATION | APPROVED |
9/6/2023
| 9:00 AM | 9/6/2023 | |
More Info
|
INSULATION COMM | APPROVED |
8/30/2023
| | 8/30/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
8/30/2023
| | 8/30/2023 | |
More Info
|
BRICKWALL TIE COMM | APPROVED |
8/28/2023
| | 8/28/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
8/24/2023
| | 8/24/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
8/24/2023
| | 8/24/2023 | |
More Info
|
MEETING | COMPLETED |
8/24/2023
| 9:30 AM | 8/25/2023 | |
More Info
|
MEETING | COMPLETED |
8/24/2023
| 9:30 AM | 8/25/2023 | |
More Info
|
ELECT RELEASE COMM | APPROVED |
8/18/2023
| | 8/18/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
8/17/2023
| | 8/17/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
8/17/2023
| | 8/17/2023 | |
More Info
|
MECHANICAL ROUGH | CANCELLED |
8/15/2023
| | 8/15/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
8/14/2023
| | 8/14/2023 | |
More Info
|
MEETING | COMPLETED |
8/11/2023
| 11:00 AM | 8/14/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
8/10/2023
| | 8/10/2023 | |
More Info
|
FIREINSULATION | APPROVED |
8/8/2023
| | 8/7/2023 | |
More Info
|
MECHANICAL ROUGH | CANCELLED |
8/7/2023
| | 8/7/2023 | |
More Info
|
FIREINSULATION | PARTIAL APPROVAL |
8/7/2023
| 8:00 AM | 8/7/2023 | |
More Info
|
INSPECTION ASSIST | COMPLETED |
8/7/2023
| 8:00 AM | 8/7/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
8/3/2023
| | 8/3/2023 | |
More Info
|
ELECT ROUGH COMM | CANCELLED |
8/2/2023
| | 8/2/2023 | |
More Info
|
GAS PRESSURE | APPROVED |
7/27/2023
| | 7/27/2023 | |
More Info
|
INSULATION COMM | APPROVED |
7/26/2023
| | 7/26/2023 | |
More Info
|
CONSTRUCTION SAFETY | COMPLETED |
7/26/2023
| 10:00 AM | 7/26/2023 | 10:45 AM |
More Info
|
BRICKWALL TIE COMM | APPROVED |
7/19/2023
| | 7/19/2023 | |
More Info
|
BRICKWALL TIE COMM | APPROVED |
7/14/2023
| | 7/14/2023 | |
More Info
|
BRICKWALL TIE COMM | APPROVED |
7/11/2023
| | 7/11/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
7/11/2023
| | 7/11/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
7/5/2023
| | 7/5/2023 | |
More Info
|
DRYWALL COMM | PARTIAL APPROVAL |
6/28/2023
| | 6/28/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
6/28/2023
| | 6/28/2023 | |
More Info
|
DRYWALL COMM | COMM FAILED |
6/23/2023
| | 6/23/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
6/16/2023
| | 6/16/2023 | |
More Info
|
FIREINSULATION | FIRE FAILED |
6/14/2023
| | 6/14/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
6/8/2023
| | 6/8/2023 | |
More Info
|
INSULATION COMM | APPROVED |
6/8/2023
| | 6/8/2023 | |
More Info
|
INSULATION COMM | APPROVED |
6/7/2023
| | 6/7/2023 | |
More Info
|
FRAME COMM | APPROVED |
6/2/2023
| | 6/2/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
6/2/2023
| | 6/2/2023 | |
More Info
|
INSULATION COMM | APPROVED |
5/31/2023
| | 5/31/2023 | |
More Info
|
FRAME COMM | APPROVED |
5/25/2023
| | 5/25/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
5/25/2023
| | 5/25/2023 | |
More Info
|
MECHANICAL ROUGH | PARTIAL APPROVAL |
5/24/2023
| | 5/24/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/24/2023
| | 5/24/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
5/24/2023
| | 5/24/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
5/19/2023
| | 5/19/2023 | |
More Info
|
MECHANICAL ROUGH | COMM FAILED |
5/17/2023
| | 5/17/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
5/16/2023
| | 5/16/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
5/11/2023
| | 5/11/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/9/2023
| | 5/9/2023 | |
More Info
|
FRAME COMM | APPROVED |
5/9/2023
| | 5/9/2023 | |
More Info
|
FIREINSULATION | APPROVED |
5/8/2023
| 10:30 AM | 5/8/2023 | |
More Info
|
DRYWALL COMM | APPROVED |
5/8/2023
| | 5/8/2023 | |
More Info
|
FIREINSULATION | FIRE FAILED |
5/3/2023
| 9:00 AM | 5/4/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
5/1/2023
| | 5/1/2023 | |
More Info
|
FIREINSULATION | FIRE FAILED |
4/28/2023
| 8:00 AM | 4/28/2023 | |
More Info
|
INSULATION COMM | APPROVED |
4/27/2023
| | 4/27/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
4/25/2023
| | 4/25/2023 | |
More Info
|
FRAME COMM | APPROVED |
4/24/2023
| | 4/24/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/21/2023
| | 4/21/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/21/2023
| | 4/21/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
4/18/2023
| | 4/18/2023 | |
More Info
|
FRAME COMM | APPROVED |
4/18/2023
| | 4/18/2023 | |
More Info
|
FRAME COMM | CANCELLED |
4/17/2023
| | 4/17/2023 | |
More Info
|
FOOTINGS COMM | COMM FAILED |
4/17/2023
| | 4/17/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/17/2023
| | 4/17/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/17/2023
| | 4/17/2023 | |
More Info
|
PAVING | APPROVED |
4/17/2023
| | 4/17/2023 | |
More Info
|
FIREINSULATION | FIRE FAILED |
4/14/2023
| 9:30 AM | 4/14/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/13/2023
| | 4/13/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/13/2023
| | 4/13/2023 | |
More Info
|
FRAME COMM | APPROVED |
4/13/2023
| | 4/13/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
4/11/2023
| | 4/11/2023 | |
More Info
|
MECHANICAL ROUGH | CANCELLED |
4/10/2023
| | 4/10/2023 | |
More Info
|
SHEATHING COMM | APPROVED |
4/5/2023
| | 4/5/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
3/31/2023
| | 3/31/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
3/31/2023
| | 3/31/2023 | |
More Info
|
FRAME COMM | APPROVED |
3/31/2023
| | 3/31/2023 | |
More Info
|
FRAME COMM | APPROVED |
3/30/2023
| | 3/30/2023 | |
More Info
|
MISC FRAME COMM | APPROVED |
3/30/2023
| | 3/30/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
3/27/2023
| | 3/27/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
3/27/2023
| | 3/27/2023 | |
More Info
|
MECHANICAL ROUGH | CANCELLED |
3/24/2023
| | 3/24/2023 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
3/23/2023
| | 3/23/2023 | |
More Info
|
ELECT ROUGH COMM | CANCELLED |
3/23/2023
| | 3/23/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
3/16/2023
| | 3/16/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
3/15/2023
| | 3/15/2023 | |
More Info
|
PLUMB TOP OUT COMM | COMM FAILED |
3/14/2023
| | 3/14/2023 | |
More Info
|
MECHANICAL ROUGH | COMM FAILED |
3/14/2023
| | 3/14/2023 | |
More Info
|
PLUMB TOP OUT COMM | CANCELLED |
3/13/2023
| | 3/13/2023 | |
More Info
|
MECHANICAL ROUGH | APPROVED |
3/9/2023
| | 3/9/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
3/9/2023
| | 3/9/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
3/7/2023
| | 3/7/2023 | |
More Info
|
PLUMB TOP OUT COMM | APPROVED |
3/6/2023
| | 3/6/2023 | |
More Info
|
SLAB COMM | APPROVED |
2/28/2023
| | 2/28/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
2/13/2023
| | 2/13/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
2/13/2023
| | 2/13/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
2/6/2023
| | 2/6/2023 | |
More Info
|
FOOTINGS COMM | CANCELLED |
1/30/2023
| | 1/30/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
1/27/2023
| | 1/27/2023 | |
More Info
|
FOOTINGS COMM | APPROVED |
1/25/2023
| | 1/25/2023 | |
More Info
|
SLAB COMM | APPROVED |
1/19/2023
| | 1/19/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
1/13/2023
| | 1/13/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
1/13/2023
| | 1/13/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
1/11/2023
| | 1/11/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
1/10/2023
| | 1/10/2023 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
1/10/2023
| | 1/10/2023 | |
More Info
|
FRAME COMM | CANCELLED |
1/10/2023
| | 1/10/2023 | |
More Info
|
SLAB COMM | APPROVED |
1/5/2023
| | 1/5/2023 | |
More Info
|
SHEATHING COMM | APPROVED |
1/4/2023
| | 1/4/2023 | |
More Info
|
SLAB COMM | APPROVED |
12/27/2022
| | 12/27/2022 | |
More Info
|
SLAB COMM | APPROVED |
12/15/2022
| | 12/15/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
12/2/2022
| | 12/2/2022 | |
More Info
|
PLUMBING ROUGH-IN | COMM FAILED |
12/1/2022
| | 12/1/2022 | |
More Info
|
T-POLE COMM | APPROVED |
11/28/2022
| | 11/28/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
11/23/2022
| | 11/23/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
11/23/2022
| | 11/23/2022 | |
More Info
|
SHEATHING COMM | APPROVED |
11/4/2022
| | 11/4/2022 | |
More Info
|
SET 6IN CMPND METER | APPROVED |
10/17/2022
| 9:30 AM | 10/17/2022 | |
More Info
|
METER PAYMENT | APPROVED |
10/13/2022
| | 10/13/2022 | |
More Info
|
FRAME COMM | APPROVED |
9/14/2022
| | 9/14/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
9/9/2022
| | 9/9/2022 | |
More Info
|
FOOTINGS COMM | CANCELLED |
9/8/2022
| | 9/8/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
8/31/2022
| | 8/31/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
8/30/2022
| | 8/30/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
8/19/2022
| | 8/19/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
8/11/2022
| | 8/11/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
8/4/2022
| | 8/4/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
8/1/2022
| | 8/1/2022 | |
More Info
|
FOOTINGS COMM | PARTIAL APPROVAL |
7/27/2022
| | 7/27/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
7/22/2022
| | 7/22/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
7/15/2022
| | 7/15/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
7/7/2022
| | 7/7/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
6/30/2022
| | 6/30/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
6/28/2022
| | 6/28/2022 | |
More Info
|
FOOTINGS COMM | CANCELLED |
6/28/2022
| | 6/28/2022 | |
More Info
|
FOOTINGS COMM | CANCELLED |
6/27/2022
| | 6/24/2022 | |
More Info
|
SLAB COMM | APPROVED |
6/16/2022
| | 6/16/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
6/13/2022
| | 6/13/2022 | |
More Info
|
SLAB COMM | APPROVED |
6/9/2022
| | 6/9/2022 | |
More Info
|
SLAB COMM | COMM FAILED |
6/7/2022
| | 6/7/2022 | |
More Info
|
CMUWALL | APPROVED |
6/3/2022
| | 6/3/2022 | |
More Info
|
CMUWALL | CANCELLED |
6/2/2022
| | 6/2/2022 | |
More Info
|
PIER COMM | APPROVED |
5/31/2022
| | 5/31/2022 | |
More Info
|
SLAB COMM | APPROVED |
5/26/2022
| | 5/26/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/26/2022
| | 5/26/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/24/2022
| | 5/24/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/24/2022
| | 5/24/2022 | |
More Info
|
SLAB COMM | APPROVED |
5/23/2022
| | 5/23/2022 | |
More Info
|
SLAB COMM | APPROVED |
5/13/2022
| | 5/13/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
5/13/2022
| | 5/13/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/13/2022
| | 5/13/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
5/13/2022
| | 5/13/2022 | |
More Info
|
ELECT ROUGH COMM | CANCELLED |
5/12/2022
| | 5/12/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
5/10/2022
| | 5/10/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
4/29/2022
| | 4/29/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
4/26/2022
| | 4/26/2022 | |
More Info
|
ELECT ROUGH COMM | APPROVED |
4/21/2022
| | 4/20/2022 | |
More Info
|
FOOTINGS COMM | APPROVED |
4/20/2022
| | 4/20/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
4/18/2022
| | 4/18/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
4/14/2022
| | 4/14/2022 | |
More Info
|
PLUMBING ROUGH-IN | APPROVED |
4/12/2022
| | 4/12/2022 | |
More Info
|
There are currently no reviews on this record.