Notes:
6/10/2020 10:00:22 AM
* All work performed must meet the 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
* Electrical designed and installed per the 2017 NEC with local amendments stated in City of Frisco Ordinance 19-11-98 along with the following comments
* No aluminum conductors permitted
* Conductors smaller that #12 AWG not permitted
* PV installations shall comply with 2017 NEC article 690
* Pull equipment grounds in all raceways
*Need flatwork or footing inspection prior to pour
* Subject to field inspection approval. Schedule your inspection at https://etrakit.friscotexas.gov/etrakit/ or call (972) 292-5386 for an inspection
*** City of Frisco approval is not in lieu of homeowner association HOA requirements. Reference HOA bylaws for subdivision requirements