Notes:
6/4/2020 11:16:18 AM
Patio Cover
All work performed must meet the 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
Need a flatwork inspection before the pour.
May not adversely affect drainage of neighboring properties.
Double underlayment required on composition roofs with a 4:12 pitch roof or less. Minimum
2/12 pitch for composition shingles.
Outside of post cannot encroach the rear yard setback, up to three foot over-hang is allowed. Can encroach rear build line if 10 feet away from the main structure.
R905.2.2 slope: asphalt shingles shall be used only on roof slope of two units vertical in 12 units horizontal (2:12) or greater. for roof slopes from two units vertical in 12 units horizontal (2:12) up to four units vertical in 12 units horizontal (4:12) double underlayment application is required in accordance with section r905.11
Fireplace, fire pit, outdoor kitchen (bbq grill, sink, etc) not requested or permitted.
Lag bolt must penetrate main house stud min 1 ½".
May not intrude on side yard setbacks.
Subject to field inspection approval. Schedule your inspection at https://etrakit.friscotexas.gov/etrakit/ or call (972) 292-5386 for an inspection.
City of Frisco approval is not in lieu of homeowner association HOA requirements. reference HOA bylaws for subdivision requirements.