Notes:
3/9/2020 7:36:29 AM
Patio Cover & Grill
1- All work performed must meet the 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
2- Need a flatwork inspection before the pour.
3- May not adversely affect drainage of neighboring properties.
4- Double underlayment required on composition roofs with a 4:12 pitch roof or less. Minimum
2/12 pitch for composition shingles.
5- Outside of post cannot encroach the rear yard setback, up to three foot over-hang is allowed. Can encroach rear build line if 10 feet away from the main structure.
6- R905.2.2 slope: asphalt shingles shall be used only on roof slope of two units vertical in 12 units horizontal (2:12) or greater. for roof slopes from two units vertical in 12 units horizontal (2:12) up to four units vertical in 12 units horizontal (4:12) double underlayment application is required in accordance with section r905.11
8- Fireplace, fire pit, , sink, etc) not requested or permitted.
9- Lag bolt must penetrate main house stud min 1 ½".
10- May not intrude on side yard setbacks.
11- Subject to field inspection approval. call (972) 292-5386 for inspection.
12- City of Frisco approval is not in lieu of homeowner association HOA requirements. reference HOA bylaws for subdivision requirements.