Notes:
3/9/2020 3:22:14 PM
FIRST FLOOR: 3 BEDROOMS, 2 BATHROOMS, 1 STUDY
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2018 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
014. BEAMS=10"W X 28"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND AND ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEAD WALK AND GARAGE DOOR ENHANCEMENT AND TREATMENT PER THE ENCLOSED DETAIL
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.