Notes:
1/28/2020 12:01:29 PM
Master Bathroom Remodel
ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
Plumbing
1- All work performed must meet the 2018 IRC, 2018 IPC and 2018 IMC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city Ordinances.
2- A gasoline pressure test is required when adding a gas appliance.
3- A dishwashing machine shall be protected against backflow by an air
gap or backflow preventer in accordance with section 608.
4- Compression type mechanical joints are not permitted underground.
5- Subject to field inspection approval-call (972) 292-5386 for inspection.
Electrical
1- All work performed must meet the 2017 NEC and 2018 IRC standards and abide by the City of Frisco comprehensive Zoning Ordinance, and all other city ordinances.
2- Minimum #12 copper conductors permitted except for controls.
3- No aluminum wire permitted or #14 LEC3 energy requirement required for additions.
4- Engineers letters of acceptance for framing and flooring system required prior to the City of Frisco frame inspection.
5- Subject to field inspection approval. Call (972) 292-5386 for inspection.
6- City of Frisco approval is not in lieu of homeowner association HOA requirements. Reference HOA bylaws for subdivision requirements.