Notes:
1/28/2020 2:07:42 PM
GENERAL NOTES FOR THIS INTERIOR REMODEL.
142. * ALL WORK PERFORMED MUST MEET THE 2018 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2019 NEC AND 2018 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2018 IRC AND 2018 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
** A GASLINE PRESSURE TEST IS REQUIRED WHEN ADDING A GAS APPLIANCE. ***
**A DISHWASHING MACHINE SHALL BE PROTECTED AGAINST BACKFLOW BY AN AIR
GAP OR BACKFLOW PREVENTER IN ACCORDANCE WITH SECTION 608.
**COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND**
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
**CALL 972-292-5386 FOR FOLLOW-UP INSPECTION