Notes:
1/24/2020 2:58:06 PM
SECOND FLOOR: 4 BEDROOMS, 3 BATHROOMS, 1 GAME ROOM, 1 STUDY
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
004. DRIVEWAY SLOPE MUST NOT EXCEED 12%; PLOT PLANS WITH SPOT GRADES ARE REQUIRED.
014. BEAMS=10"W X 28"D.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
033. ALL SIDING,TRIM,SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL.
041. TEMPERED GLASS REQUIRED AT WINDOWS ADJACENT TO STAIRS
042. TEMPERED GLASS REQUIRED AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQUIRED AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND AND ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEAD WALK AND GARAGE DOOR ENHANCEMENT AND TREATMENT PER THE ENCLOSED DETAIL
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
** ATTIC ACCESS MUST BE PROVIDED AS NEEDED BY BUILDER PER 2015 IRC SECTION R807.
**REVISION - ELEVATION CHANGE FROM C TO A 1/24/20.