Notes:
10/21/2019 1:51:22 PM
PATIO COVER
POST MUST BE 10' FROM REAR AND FROM MAIN STRUCTURE
142. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS. MINIMUM 2/12 PITCH FOR COMPOSITION SHINGLES
145. * OUTSIDE OF POST CAN NOT ENCROACH THE REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED. CAN ENCROACH REAR BUILD LINE IF 10 FEET AWAY FROM THE MAIN STRUCTURE.
R905.2.2SLOPE: ASPHALT SHINGLES SHALL BE USED ONLY ON ROOF SLOPE OF TWO UNITS VERTICAL IN 12 UNITS HORIZONTAL (2:12) OR GREATER. FOR ROOF SLOPES FROM TWO UNITS VERTICAL IN 12 UNITS HORIZONTAL (2:12) UP TO FOUR UNITS VERTICAL IN 12 UNITS HORIZONTAL (4:12) DOUBLE UNDERLAYMENT APPLICATION IS REQUIRED IN ACCORDANCE WITH SECTION R905.11
147. *** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.